Ramboll appointed owner’s engineer for Cumbria’s 30 MW Barrow green hydrogen plant

Engineering consultancy Ramboll has been appointed to deliver owner’s engineer services for the 30 MW Barrow Green Hydrogen Project in Barrow-in-Furness, Cumbria, as the scheme moves from investment approval into delivery.
The plant is being built by the Green Hydrogen Energy Company, a joint venture between Schroders Greencoat and Carlton Power that reached final investment decision on the project earlier this year.
Once operational, the facility is expected to supply around 100 gigawatt-hours of green hydrogen annually to consumer goods manufacturer Kimberly-Clark’s nearby plant, where products including Andrex and Kleenex are produced. The hydrogen supply is expected to cut the site’s natural gas consumption by up to half, avoiding roughly 18,300 tonnes of carbon dioxide emissions each year.
Plug Power is supplying 30 MW of its GenEco proton exchange membrane electrolysers for the scheme, while EDF subsidiary Dalkia Engineering is handling construction and commissioning using modular build techniques intended to speed up delivery. The project is supported under the UK government’s Hydrogen Business Model through the first Hydrogen Allocation Round, and its backers describe it as one of the first renewable hydrogen production facilities in Britain to reach construction.
Ramboll’s appointment covers technical oversight through the build phase as the project works towards commercial operation.
